RO-RO TRAFFIC OPERATIONA SERVICES

EFFICIENCY, PROFICIENCY AND RELIABILITY

The operational services supplied by the terminal concern transfer, collection, distribution, delivery, goods composition/decomposition, to meet vehicles and loading unit parking needs.

  • Loading/unloading operations
  • Trailer moving through tractors
  • Loading/unloading area (distinct for Schengen and extra Schengen traffic)
  • cold ironing – electricity supply for reefer trailer
  • Vehicles and trailer parking area up to 210.000 sq. m

Main RO-RO logistic activities

Loading/Unloading

Venice Ro Port Mos staff deals with ship loading and unloading activities, coordinating trailers position on the ship’s decks (as detailed in loading plan), lushing, fastening loading units to deck to guarantee the stability during navigation.
When moving driven vehicles, movements are carried put by drivers and terminal staff attends to address vehicles to loading and lashing activities.

TRAILER MOVEMENTS

Goods and vehicle movements is carried out with port tractors, which transfer loading units from parking area to ship’s garage and vice-versa. Thanks to his vehicle fleet, Venice Ro port Mos staff can fulfil every kind of traffic requirements.

PARKING

The terminal offers to forwarders and carriers up to 210.00. sq. m of parking area for trailers.
Efficient parking management allows to optimize waiting and exit time.

COLD IRONING

Venice Intermodal Terminal offers electrical supply for parking vehicles; these measures contribute to reduce air emissions creating an eco-friendly terminal.  Cold ironing allows to refrigerate cold containers even after stopping their engines, creating positive economic and environmental effects.